FEASIBILITY STUDIES FOR INTERCONNECTION OF WIND POWER PLANTS

Grid Interconnection Studies of nearly all the major Grid Connected Wind Power Plants with the National Grid of Pakistan for evacuation of their power in Jhimpir and Gharo Clusters as follows:

  • 50 MW Zorlu
  • 50 MW Each Fauji Wind Energy Ltd.-1 and II
  • 50 MW Sachal Power
  • 100 MW Wind Farm Project For SZABIST
  • 3×10 MW Akhter, Tapal and Ismael Power
  • 50 MW Zephyr
  • 50 MW Master Wind Energy
  • 100 MW United Energy Pakistan (UEP)
  • 9 MW Titan Energy
  • 50 MW New Park Wind Energy
  • 50 MW HYDROCHINA Dawood
  • 50 MW Wind Eagle-1
  • 50 MW Zeni
  • 50 MW Fina Enerji
  • 50 MW Wind Eagle-2
  • 50 MW HAWA
  • 50 MW China SUNEC Energy
  • 2×50 MW Sindh Govt.
  • 100 MW NBT SZABIST
  • 50 MW Gul Ahmad
  • 2×250 MW NBT Wind Power Pakistan Ltd.
  • 50 MW Dewan (Burj) Energy Ltd.
  • 50 MW Yunus (Lucky)
  • 13.5 MW Burj Power
  • 50 MW Sapphire
  • 50 MW Hartford
  • 10 MW Gharo (with KESC)
  • 50 MW Metro Power Co.
  • 50 MW Tenaga Power
  • 50 MW TGF

Our Partners

  • Copyright © 2021 All Rights Reserved.